700-800TPH limestone production line

700-800TPH limestone production line

Flow Chart Introduction
After explosion, < 1020mm limestone will be conveyed into vibrating feeder by dumper, then the stone will be fed into jaw crusher for primary crushing, the discharged material is about 150-300mm; after primary crushing, the discharged material will be conveyed into impact crusher for secondary crushing; then the discharged material will be conveyed into vibrating screen, the required sizes will be screened out and the oversized material will return impact crusher for re-crushing until all the final products is the required sizes.

Note: 300mm material will be fed into impact crusher directly, no use of jaw crusher.

Configuration List

Equipment Model Quantity
Vibrating feeder ZSW1500×6000 1set
Jaw crusher PE-1200×1500 1set
Vibrating feeder ZSW1300×4900 2sets
Impact crusher PFS1318 4sets
Vibrating screen 4YZS2460 4sets