Online

WhatsApp

Message

Top

Home >> Global Case >> Asia >>

Kefid Power plant limestone desulfurization circulating fluidized bed project in shanxiChina

Kefid Power plant limestone desulfurization circulating fluidized bed project in shanxiChina

Material : Limestone

Output size : Inside the furnace: 0.1-1.5mm D50=0.45mm;After the furnace: ≤0.063mm 250 mesh D90

Capacity : ≥200T/H

Equipment :4 MTW215 European Grinding Mill

Process Description

The project will construct two 660,000 kilowatt supercritical circulating fluidized bed units and simultaneously construct desulfurization and denitrification devices. After the project is completed, it will be the world's first coal gangue power generation project using a 660MW-class supercritical circulating fluidized bed boiler. The annual heat supply is expected to reach 10 million GJ, and the annual consumption of low-calorific value coal in the mining area will reach 5.1 million tons.
 

Customer Reviews

Accelerate urban transformation, improve local heating air quality; realize "West-East Power Transmission" to fill the growing electricity load.

Top