Question: How much is the vertical mill for processing 200,000 tons per year blast furnace pulverized coal?


Reply:

Dear Larry,


For the production line with an annual output of 200,000 tons, Kefid has many similar customer production cases at home and abroad. Take a pulverized coal preparation system of a steel plant as an example, the processing material is bituminous coal, with a particle size of 200 meshes, and a single machine produces 18-22 tons/hour. The equipment host configures two LM1500 vertical mills and jaw crusher.
 
This project is a pulverized coal preparation project of a steel mill. The main machine is equipped with LM1500 vertical mill with a power of 600 KW. The desulfurization, denitrification and dust removal devices are installed integrally, making the combustion efficiency of the pulverized coal boiler higher, the output higher and pollutant discharge reducted. It is a very good equipment for pulverized powder in coal preparation, power plant desulphurization, cement and slag. According to customer evaluations, Kefid's vertical mill has been operating stably. It has been used for more than 6 years. It has high output, low consumption of wearing parts.
 
If you are interested in vertical mill, please contact our 24hour online customer service.
 